Contractor vs FTE Cost Calculator

Compare annual contractor cost with fully loaded employee cost for a project role or capability decision.

Runs in your browserProfessional PM contextAssumptions remain visible

Inputs

Calculation data

Use this when
Use this during resource planning, team formation, sprint or phase planning, and whenever demand appears to exceed available capacity.
Prepare
Separate gross availability from productive capacity and include calendars, leave, skills, allocation limits, overhead, and realistic focus factors.
Decision supported
Use the output to rebalance assignments, change timing, secure skills, adjust scope, or discuss sustainable delivery options with sponsors.
Practitioner guidance and limitations

Interpret and act

Treat high utilization cautiously: a system operating near full capacity often creates queues, delays, quality issues, and burnout.

Professional caution

People are not interchangeable units. Validate skill fit, onboarding, collaboration overhead, and individual constraints before changing the plan.

Learn the topic: concept, PMP lens, and common mistakes

Core concept

Resource capacity is net productive availability after calendars, leave, operational work, collaboration, and focus loss. Headcount alone is not a capacity measure.

Professional application

Use the result to resolve overload through sequencing, leveling, skill changes, scope trade-offs, or additional capacity—not sustained over-utilization.

PMP exam and practice lens

Resource leveling may change the critical path and finish date; resource smoothing works within available float. A RACI chart clarifies accountability but does not solve insufficient capacity.

Common mistakes

  • Planning against gross hours instead of net availability
  • Treating people with different skills as interchangeable
  • Targeting 100% utilization and creating queues, burnout, and quality loss

Before you trust the result

  • Confirm one status date and consistent units.
  • Retain the input source, owner, and confidence.
  • Sense-check the result against an independent benchmark.
  • Record the decision, action owner, and review date.

How the Contractor vs FTE Cost calculation works

Compare annual contractor cost with fully loaded employee cost for a project role or capability decision.

Formulas

MeasureFormula
Loaded FTE costLoaded FTE cost = Salary × (1 + benefits % + overhead %)
Contractor costContractor cost = Hourly rate × annual hours

What the terms mean

Annual FTE salary
Currency amount
Benefits load
Measured in %
Employer overhead
Measured in %
Contractor hourly rate
Currency amount
Annual contractor hours
Measured in hours

Worked example

Inputs

  • Annual FTE salary = $110,000
  • Benefits load = 28 %
  • Employer overhead = 18 %
  • Contractor hourly rate = $95
  • Annual contractor hours = 1,800 hours

Results

  1. Fully loaded FTE cost = $160,600 / year
  2. Contractor cost = $171,000 / year
  3. Contractor premium = $10,400

What it means: The contractor has a direct cost premium; weigh speed, flexibility, scarcity, duration, employment rules, knowledge retention, and transition risk.

Frequently asked questions

What does the Contractor vs FTE Cost calculator do?

Compare annual contractor cost with fully loaded employee cost for a project role or capability decision.

What is the formula for contractor vs fte cost?

Loaded FTE cost = Salary × (1 + benefits % + overhead %); Contractor cost = Hourly rate × annual hours.

What inputs do I need?

You need: annual fte salary, benefits load, employer overhead, contractor hourly rate, annual contractor hours. Use figures from the same status date and the same units.

How do I read the result?

The contractor has a direct cost premium; weigh speed, flexibility, scarcity, duration, employment rules, knowledge retention, and transition risk. Treat the figure as one piece of evidence and compare it with your baseline, thresholds and project context.

Sources and method

This calculator applies the formula shown above to the figures you enter. The worked example is computed by the same code.