Project management terms, defined with the formula
Each entry gives the definition first, then the formula, a worked example and the calculator to try it in. 35 terms, from earned value to Little’s Law.
- Actual cost (AC)Actual cost is what the completed work has really cost up to a status date, including costs incurred but not yet paid.
- Benefit-cost ratio (BCR)The benefit-cost ratio divides the present value of benefits by the present value of costs. Above 1.0 means benefits outweigh costs.
- Break-even pointThe break-even point is the sales volume at which revenue equals total cost.
- Budget at completion (BAC)Budget at completion is the total approved budget for the work, the reference for all cost forecasts.
- Communication channelsThe number of potential one-to-one communication channels among n people is n(n − 1) ÷ 2.
- Contingency reserveA contingency reserve is time or money held inside the baseline for identified risks.
- Cost performance index (CPI)CPI is earned value divided by actual cost. A value below 1.0 means the project is over budget for the work done.
- Cost variance (CV)Cost variance is earned value minus actual cost. A negative value means the completed work cost more than budgeted.
- Critical pathThe critical path is the longest chain of dependent activities in a schedule. It sets the shortest possible project duration.
- Cycle timeCycle time is the elapsed time from starting work on an item to finishing it.
- Earned value (EV)Earned value is the budgeted cost of the work actually completed at a status date. It measures progress in money, not effort spent.
- Estimate at completion (EAC)Estimate at completion is the forecast of total project cost: what has been spent plus what is expected to be spent.
- Estimate to complete (ETC)Estimate to complete is the forecast cost still needed to finish the work.
- Expected monetary value (EMV)Expected monetary value is the probability of an event times its financial impact.
- Free floatFree float is how long an activity can be delayed without delaying the early start of any successor.
- Internal rate of return (IRR)Internal rate of return is the discount rate at which a project’s NPV is zero. It is the project’s annualised return.
- Lead timeLead time is the elapsed time from a request being made to its delivery, including waiting.
- Management reserveManagement reserve is budget held outside the cost baseline for unknown risks, released only with senior approval.
- Net present value (NPV)Net present value is the sum of a project’s cash flows after discounting each one to today. A positive NPV means the project earns more than the discount rate.
- Payback periodPayback period is the time it takes for cumulative cash inflows to repay the initial investment.
- PERT (program evaluation and review technique)PERT estimates an activity’s duration from three values (optimistic, most likely, pessimistic) and weights the most likely one four times.
- Planned value (PV)Planned value is the approved budget for the work scheduled to be completed by a status date.
- RACI matrixA RACI matrix assigns Responsible, Accountable, Consulted and Informed roles to each activity so ownership is clear.
- Return on investment (ROI)Return on investment is net benefit divided by cost, as a percentage. It ignores when the cash arrives.
- Risk registerA risk register lists identified risks with their probability, impact, owner and planned response.
- Schedule performance index (SPI)SPI is earned value divided by planned value. A value below 1.0 means less work is done than planned.
- Schedule variance (SV)Schedule variance is earned value minus planned value. A negative value means less work is done than planned.
- Scope creepScope creep is uncontrolled growth in project scope without matching changes to cost, time and resources.
- Three-point estimateA three-point estimate uses an optimistic, a most likely and a pessimistic value to describe an activity’s cost or duration.
- ThroughputThroughput is the number of items a team finishes in a period.
- To-complete performance index (TCPI)TCPI is the cost efficiency the project must achieve on the remaining work to meet a target such as BAC or EAC.
- Total float (slack)Total float is how long an activity can be delayed without delaying the project end date.
- Variance at completion (VAC)Variance at completion is the forecast difference between the original budget and the estimate at completion.
- VelocityVelocity is the amount of work, usually story points, a team completes per sprint. Teams use it to forecast how many sprints a backlog needs.
- Work breakdown structure (WBS)A work breakdown structure breaks the project’s deliverables into smaller work packages that can be estimated, assigned and tracked.