Work breakdown structure (WBS)
A work breakdown structure breaks the project’s deliverables into smaller work packages that can be estimated, assigned and tracked.
Formula
100% rule: the WBS includes all of the work and nothing outside it
Worked example
A website project might break into Design, Build, Content and Launch, each split into work packages of a few days.
Why it matters
The WBS is the base for scope, cost, schedule and responsibility.
Common mistake
Organising it by activity or phase instead of by deliverable.
Try it in a calculator
- Project Completion Percentage Calculator: Calculate weighted project completion using completed scope value rather than subjective effort-spent estimates.
- Scope Creep Risk: Assess conditions that make uncontrolled scope growth likely.
Frequently asked questions
What is a work package?
The lowest level of the WBS, small enough to estimate and assign.
What is a WBS dictionary?
A document describing each WBS element.