Work breakdown structure (WBS)

A work breakdown structure breaks the project’s deliverables into smaller work packages that can be estimated, assigned and tracked.

Formula

100% rule: the WBS includes all of the work and nothing outside it

Worked example

A website project might break into Design, Build, Content and Launch, each split into work packages of a few days.

Why it matters

The WBS is the base for scope, cost, schedule and responsibility.

Common mistake

Organising it by activity or phase instead of by deliverable.

Try it in a calculator

Frequently asked questions

What is a work package?

The lowest level of the WBS, small enough to estimate and assign.

What is a WBS dictionary?

A document describing each WBS element.