Break-even point
The break-even point is the sales volume at which revenue equals total cost.
Formula
Break-even units = fixed costs ÷ (price − variable cost per unit)
Worked example
Fixed costs $10,000, price $50, variable cost $30: 10,000 ÷ 20 = 500 units.
Why it matters
It shows how much must be sold before a project makes a profit.
Common mistake
Treating step-fixed costs as constant across all volumes.
Try it in a calculator
- Break-Even Analysis: Find the volume or time needed to cover fixed and variable costs.
- Project Profit Margin Calculator: Calculate project gross profit and margin to assess commercial performance against the approved revenue and cost forecast.
Frequently asked questions
What is contribution margin?
Price minus variable cost per unit.
What is margin of safety?
How far sales can fall before reaching break-even.